Oil Base Mud
Home Up

 

Home MCT-1000 MCT-500 Oil Base Mud Water Base Mud Rate Sheet

Dennis Energy Services, Inc.

 

SITUATION

PRODUCTS

LBS/BBL

PILL

SWEEP FREQUENCY

 

NOTES

 

PREVENTIVE SWEEPS

 

MCT-500

 

MCT-1000

 

7 P.P.B.

 

15 – 25 bbls

 

6 – 8 hours

w         Dilute with diesel or mud as required.

w         Pump sweep every 6 - 8 hours, and additional as each potential problem sand is drilled.

w         Continue sweeps as long as underblalaced sands are exposed.

w         Add wetting agent per mud company rep. directions.  

 

SEEPAGE SWEEPS

 

MCT-500  

 

MCT-1000

 

5 P.P.B.

   

 

10 P.P.B.

 

50 bbls

 

4 hours or 100’ of new hole drilled

w         Pump 25 – 50 bbls sweeps (calculated to cover 500’ of hole).

w         Pump sweep every 4 hours or 100’ of hole drilled.

w         Adjust frequency for severity of problems.

w         Continue sweeping program as long as underbalanced sands are exposed.

w         Maintain pH above 9.5.  

 

LOST CIRCULATION

   

“PARTIAL RETURNS”

   

MCT-500

 

MCT-1000

 

20 P.P.B.

   

16 P.P.B.

 

50 bbls

 

Pump sweeps as conditions dictate

2 – 3 Sweeps may be required to control losses

 

w         Mix DESI SEAL Medium first, then add the fine.

w         Dilute with mud or water as required.

w         Pump sweeps at reduced speed.

w         Adjust concentration and frequency as conditions dictate.

w         Spot pill in place should conditions worsen.  

 

LOST CIRCULATION

 

TOTAL LOSS & LESS THAN 50% RETURNS

 

MCT-500

 

MCT-1000

 

32 P.P.B.

 

13 P.P.B.

 

50 bbls

 

Spot pills

 

Follow up with sweeping program as required.

w         Mix Medium first, then add the fine.

w         Dilute with mud or water as required.

w         Pump pill at reduced pump speed.

w         Spot pill at suspected loss zone.

w         POOH (or to last casing) Allow hole to heal.

w         Stage in hole after regaining circulation.

w         Establish regular sweeping program to TD.